- Hardware
Installing the ezeio
The ezeio itself is very easy to install.
Start by mounting the unit where you need it. Make sure it's in a dry location and not exposed to excessive dust or extreme temperatures.
More details on how to mount the hardware
Before connecting sensors and devices, make sure the antenna is mounted on the antenna bracket, and placed in a location free from large metal items that could shield the signal.
Then apply power using the power supply that came with the ezeio, and make sure the ezeio SERVER light goes green. This may take a few minutes that first time, but should not take longer than 5 minutes.
More details on the power requirements
After confirming the SERVER light go green (meaning the ezeio communicated with the cloud servers), disconnect power and continue adding your sensors and devices.
Connecting to the ezeio inputs
In this section
- Installing the hardwareBefore mounting the unit, please remember to register it online. The registration code is on the side label, and may be difficult to access after the unit has been...
- Power supply and power connectionsThe ezeio shall be powered from a DC (Direct Current) source, such as a AC/DC adapter, power supply or battery. Use only supplied or recommended power supplies with...
Last updated Jul 22, 2024